  "materials": [
    {
      "id": 1,
      "list": "price_list",
      "name": "Ready-mix concrete",
      "unit": "m3",
      "unit_price": 118
    },
    {
      "id": 2,
      "list": "price_list",
      "name": "Reinforcement bar",
      "unit": "tonne",
      "unit_price": 780
    },
    {
      "id": 3,
      "list": "price_list",
      "name": "Structural steel section",
      "unit": "tonne",
      "unit_price": 1250
    },
    {
      "id": 4,
      "list": "price_list",
      "name": "Facing brick",
      "unit": "1000",
      "unit_price": 640
    },
    {
      "id": 5,
      "list": "price_list",
      "name": "Concrete block",
      "unit": "pallet",
      "unit_price": 215
    },
    {
      "id": 6,
      "list": "price_list",
      "name": "Plasterboard sheet",
      "unit": "sheet",
      "unit_price": 9.4
    },
    {
      "id": 7,
      "list": "price_list",
      "name": "Insulation board",
      "unit": "sheet",
      "unit_price": 21.5
    },
    {
      "id": 8,
      "list": "price_list",
      "name": "Roof tile",
      "unit": "m2",
      "unit_price": 34
    },
    {
      "id": 9,
      "list": "price_list",
      "name": "Copper pipe",
      "unit": "metre",
      "unit_price": 8.6
    },
    {
      "id": 10,
      "list": "price_list",
      "name": "Electrical cable",
      "unit": "drum",
      "unit_price": 165
    },
    {
      "id": 11,
      "list": "price_list",
      "name": "Timber joist",
      "unit": "metre",
      "unit_price": 5.2
    },
    {
      "id": 12,
      "list": "price_list",
      "name": "Double-glazed unit",
      "unit": "unit",
      "unit_price": 280
    },
    {
      "id": 13,
      "list": "price_list",
      "name": "Floor screed",
      "unit": "bag",
      "unit_price": 6.8
    },
    {
      "id": 14,
      "list": "price_list",
      "name": "Paint, masonry",
      "unit": "tin",
      "unit_price": 54
    }
  ],
  "projects": [
    {
      "id": 1,
      "name": "Foundry Kingsway",
      "building_type": "apartment_block",
      "city": "Sacramento",
      "budget": 6682487,
      "starts_on": "2025-02-25",
      "status": "snagging"
    },
    {
      "id": 2,
      "name": "Meridian Riverside",
      "building_type": "apartment_block",
      "city": "Weberfurt",
      "budget": 3568953,
      "starts_on": "2025-04-10",
      "status": "handed_over"
    },
    {
      "id": 3,
      "name": "Harbour Station",
      "building_type": "apartment_block",
      "city": "Rio Rancho",
      "budget": 2020306,
      "starts_on": "2025-04-14",
      "status": "handed_over"
    },
    {
      "id": 4,
      "name": "Riverside Albion",
      "building_type": "office_fit_out",
      "city": "New Gastonfield",
      "budget": 4499351,
      "starts_on": "2025-01-15",
      "status": "on_site"
    },
    {
      "id": 5,
      "name": "Albion Maple",
      "building_type": "clinic",
      "city": "Port Kelvin",
      "budget": 7087345,
      "starts_on": "2025-06-09",
      "status": "on_site"
    },
    {
      "id": 6,
      "name": "Kingsway Harbour",
      "building_type": "warehouse",
      "city": "Maggiohaven",
      "budget": 7677096,
      "starts_on": "2025-05-19",
      "status": "snagging"
    }
  ],
  "subcontractors": [
    {
      "id": 1,
      "panel": "approved_panel",
      "trading_as": "Ashdown Electrical",
      "trade": "electrical",
      "day_rate": 310
    },
    {
      "id": 2,
      "panel": "approved_panel",
      "trading_as": "Brightwell Plumbing and Heating",
      "trade": "plumbing",
      "day_rate": 295
    },
    {
      "id": 3,
      "panel": "approved_panel",
      "trading_as": "Carrick Groundworks",
      "trade": "groundworks",
      "day_rate": 340
    },
    {
      "id": 4,
      "panel": "approved_panel",
      "trading_as": "Dunmore Roofing",
      "trade": "roofing",
      "day_rate": 305
    },
    {
      "id": 5,
      "panel": "approved_panel",
      "trading_as": "Elmhurst Plastering",
      "trade": "plastering",
      "day_rate": 260
    },
    {
      "id": 6,
      "panel": "approved_panel",
      "trading_as": "Fenwick Scaffolding",
      "trade": "scaffolding",
      "day_rate": 285
    },
    {
      "id": 7,
      "panel": "approved_panel",
      "trading_as": "Grayling Joinery",
      "trade": "joinery",
      "day_rate": 275
    },
    {
      "id": 8,
      "panel": "approved_panel",
      "trading_as": "Harcourt Steel Erection",
      "trade": "steelwork",
      "day_rate": 365
    },
    {
      "id": 9,
      "panel": "approved_panel",
      "trading_as": "Ivybridge Glazing",
      "trade": "glazing",
      "day_rate": 320
    },
    {
      "id": 10,
      "panel": "approved_panel",
      "trading_as": "Jarrow Flooring",
      "trade": "flooring",
      "day_rate": 250
    }
  ],
  "tasks": [
    {
      "id": 1,
      "project_id": 5,
      "task_no": 1,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-06-10",
      "planned_days": 29,
      "planned_cost": 59767.23,
      "status": "complete",
      "overrun_days": -4
    },
    {
      "id": 2,
      "project_id": 2,
      "task_no": 1,
      "subcontractor_id": 7,
      "trade": "joinery",
      "planned_start": "2025-04-22",
      "planned_days": 54,
      "planned_cost": 69716.87,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 3,
      "project_id": 3,
      "task_no": 1,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-04-19",
      "planned_days": 7,
      "planned_cost": 157446.04,
      "status": "complete",
      "overrun_days": 16
    },
    {
      "id": 4,
      "project_id": 1,
      "task_no": 1,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-03-09",
      "planned_days": 53,
      "planned_cost": 178187.81,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 5,
      "project_id": 4,
      "task_no": 1,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-01-21",
      "planned_days": 40,
      "planned_cost": 29669.05,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 6,
      "project_id": 4,
      "task_no": 2,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-02-01",
      "planned_days": 9,
      "planned_cost": 16086.84,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 7,
      "project_id": 5,
      "task_no": 2,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-06-17",
      "planned_days": 16,
      "planned_cost": 4022.06,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 8,
      "project_id": 4,
      "task_no": 3,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-02-19",
      "planned_days": 21,
      "planned_cost": 61127.17,
      "status": "complete",
      "overrun_days": 11
    },
    {
      "id": 9,
      "project_id": 1,
      "task_no": 2,
      "subcontractor_id": 10,
      "trade": "flooring",
      "planned_start": "2025-03-21",
      "planned_days": 3,
      "planned_cost": 18096.97,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 10,
      "project_id": 6,
      "task_no": 1,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-05-31",
      "planned_days": 3,
      "planned_cost": 38126.06,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 11,
      "project_id": 4,
      "task_no": 4,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-03-01",
      "planned_days": 57,
      "planned_cost": 46279.86,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 12,
      "project_id": 3,
      "task_no": 2,
      "subcontractor_id": 5,
      "trade": "plastering",
      "planned_start": "2025-05-03",
      "planned_days": 6,
      "planned_cost": 4192.89,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 13,
      "project_id": 4,
      "task_no": 5,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-03-11",
      "planned_days": 4,
      "planned_cost": 46493.85,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 14,
      "project_id": 6,
      "task_no": 2,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-06-09",
      "planned_days": 5,
      "planned_cost": 41582.58,
      "status": "complete",
      "overrun_days": 24
    },
    {
      "id": 15,
      "project_id": 5,
      "task_no": 3,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-06-26",
      "planned_days": 3,
      "planned_cost": 89305.74,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 16,
      "project_id": 6,
      "task_no": 3,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-06-23",
      "planned_days": 6,
      "planned_cost": 93916.97,
      "status": "complete",
      "overrun_days": 29
    },
    {
      "id": 17,
      "project_id": 3,
      "task_no": 3,
      "subcontractor_id": 5,
      "trade": "plastering",
      "planned_start": "2025-05-17",
      "planned_days": 35,
      "planned_cost": 28279.24,
      "status": "complete",
      "overrun_days": 2
    },
    {
      "id": 18,
      "project_id": 5,
      "task_no": 4,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-07-05",
      "planned_days": 30,
      "planned_cost": 77346.23,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 19,
      "project_id": 5,
      "task_no": 5,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-07-21",
      "planned_days": 32,
      "planned_cost": 55304.55,
      "status": "complete",
      "overrun_days": 10
    },
    {
      "id": 20,
      "project_id": 6,
      "task_no": 4,
      "subcontractor_id": 7,
      "trade": "joinery",
      "planned_start": "2025-07-04",
      "planned_days": 3,
      "planned_cost": 6221.3,
      "status": "complete",
      "overrun_days": 24
    },
    {
      "id": 21,
      "project_id": 1,
      "task_no": 3,
      "subcontractor_id": 10,
      "trade": "flooring",
      "planned_start": "2025-03-30",
      "planned_days": 19,
      "planned_cost": 24043.87,
      "status": "complete",
      "overrun_days": -1
    },
    {
      "id": 22,
      "project_id": 4,
      "task_no": 6,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-03-28",
      "planned_days": 35,
      "planned_cost": 14517.39,
      "status": "complete",
      "overrun_days": 34
    },
    {
      "id": 23,
      "project_id": 5,
      "task_no": 6,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-07-29",
      "planned_days": 52,
      "planned_cost": 50324.9,
      "status": "complete",
      "overrun_days": -1
    },
    {
      "id": 24,
      "project_id": 6,
      "task_no": 5,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-07-19",
      "planned_days": 4,
      "planned_cost": 20686.36,
      "status": "complete",
      "overrun_days": 29
    },
    {
      "id": 25,
      "project_id": 6,
      "task_no": 6,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-07-27",
      "planned_days": 35,
      "planned_cost": 125518.89,
      "status": "complete",
      "overrun_days": 37
    },
    {
      "id": 26,
      "project_id": 4,
      "task_no": 7,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-04-07",
      "planned_days": 3,
      "planned_cost": 71111.83,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 27,
      "project_id": 3,
      "task_no": 4,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-05-30",
      "planned_days": 18,
      "planned_cost": 52834.41,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 28,
      "project_id": 2,
      "task_no": 2,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-05-06",
      "planned_days": 9,
      "planned_cost": 21914.89,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 29,
      "project_id": 6,
      "task_no": 7,
      "subcontractor_id": 10,
      "trade": "flooring",
      "planned_start": "2025-08-11",
      "planned_days": 10,
      "planned_cost": 42928.1,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 30,
      "project_id": 3,
      "task_no": 5,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-06-17",
      "planned_days": 8,
      "planned_cost": 140278.78,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 31,
      "project_id": 5,
      "task_no": 7,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-08-14",
      "planned_days": 10,
      "planned_cost": 31962.85,
      "status": "complete",
      "overrun_days": 23
    },
    {
      "id": 32,
      "project_id": 6,
      "task_no": 8,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-08-20",
      "planned_days": 27,
      "planned_cost": 145740.41,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 33,
      "project_id": 1,
      "task_no": 4,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-04-14",
      "planned_days": 18,
      "planned_cost": 165473.26,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 34,
      "project_id": 2,
      "task_no": 3,
      "subcontractor_id": 5,
      "trade": "plastering",
      "planned_start": "2025-05-12",
      "planned_days": 7,
      "planned_cost": 41799.37,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 35,
      "project_id": 2,
      "task_no": 4,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-05-30",
      "planned_days": 25,
      "planned_cost": 101477.25,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 36,
      "project_id": 6,
      "task_no": 9,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-08-26",
      "planned_days": 3,
      "planned_cost": 23166.9,
      "status": "complete",
      "overrun_days": 41
    },
    {
      "id": 37,
      "project_id": 1,
      "task_no": 5,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-04-30",
      "planned_days": 53,
      "planned_cost": 28635.51,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 38,
      "project_id": 6,
      "task_no": 10,
      "subcontractor_id": 6,
      "trade": "scaffolding",
      "planned_start": "2025-09-09",
      "planned_days": 25,
      "planned_cost": 137927.88,
      "status": "complete",
      "overrun_days": -2
    },
    {
      "id": 39,
      "project_id": 6,
      "task_no": 11,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-09-17",
      "planned_days": 18,
      "planned_cost": 140163.06,
      "status": "complete",
      "overrun_days": 6
    },
    {
      "id": 40,
      "project_id": 1,
      "task_no": 6,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-05-19",
      "planned_days": 44,
      "planned_cost": 4010.2,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 41,
      "project_id": 1,
      "task_no": 7,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-05-29",
      "planned_days": 8,
      "planned_cost": 133071.04,
      "status": "complete",
      "overrun_days": -3
    },
    {
      "id": 42,
      "project_id": 4,
      "task_no": 8,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-04-16",
      "planned_days": 5,
      "planned_cost": 31563.91,
      "status": "complete",
      "overrun_days": -4
    },
    {
      "id": 43,
      "project_id": 2,
      "task_no": 5,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-06-05",
      "planned_days": 21,
      "planned_cost": 907.89,
      "status": "complete",
      "overrun_days": 18
    },
    {
      "id": 44,
      "project_id": 4,
      "task_no": 9,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-05-01",
      "planned_days": 13,
      "planned_cost": 30786.2,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 45,
      "project_id": 1,
      "task_no": 8,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-06-15",
      "planned_days": 19,
      "planned_cost": 59457.29,
      "status": "complete",
      "overrun_days": 9
    },
    {
      "id": 46,
      "project_id": 6,
      "task_no": 12,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-09-26",
      "planned_days": 33,
      "planned_cost": 150934.67,
      "status": "complete",
      "overrun_days": 42
    },
    {
      "id": 47,
      "project_id": 6,
      "task_no": 13,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-10-14",
      "planned_days": 41,
      "planned_cost": 35667.06,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 48,
      "project_id": 4,
      "task_no": 10,
      "subcontractor_id": 10,
      "trade": "flooring",
      "planned_start": "2025-05-07",
      "planned_days": 38,
      "planned_cost": 39073.48,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 49,
      "project_id": 5,
      "task_no": 8,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-08-27",
      "planned_days": 8,
      "planned_cost": 59136.41,
      "status": "complete",
      "overrun_days": 29
    },
    {
      "id": 50,
      "project_id": 4,
      "task_no": 11,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-05-21",
      "planned_days": 55,
      "planned_cost": 94942.47,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 51,
      "project_id": 4,
      "task_no": 12,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-05-27",
      "planned_days": 33,
      "planned_cost": 57620.82,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 52,
      "project_id": 6,
      "task_no": 14,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-10-23",
      "planned_days": 15,
      "planned_cost": 15957.29,
      "status": "complete",
      "overrun_days": -3
    },
    {
      "id": 53,
      "project_id": 2,
      "task_no": 6,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-06-21",
      "planned_days": 3,
      "planned_cost": 131604.82,
      "status": "complete",
      "overrun_days": 22
    },
    {
      "id": 54,
      "project_id": 3,
      "task_no": 6,
      "subcontractor_id": 10,
      "trade": "flooring",
      "planned_start": "2025-06-30",
      "planned_days": 11,
      "planned_cost": 1299.35,
      "status": "complete",
      "overrun_days": 5
    },
    {
      "id": 55,
      "project_id": 5,
      "task_no": 9,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-09-09",
      "planned_days": 38,
      "planned_cost": 41129.58,
      "status": "complete",
      "overrun_days": 22
    },
    {
      "id": 56,
      "project_id": 5,
      "task_no": 10,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-09-17",
      "planned_days": 38,
      "planned_cost": 120746.75,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 57,
      "project_id": 4,
      "task_no": 13,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-06-16",
      "planned_days": 25,
      "planned_cost": 7974.47,
      "status": "complete",
      "overrun_days": 26
    },
    {
      "id": 58,
      "project_id": 1,
      "task_no": 9,
      "subcontractor_id": 6,
      "trade": "scaffolding",
      "planned_start": "2025-07-05",
      "planned_days": 16,
      "planned_cost": 22667.14,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 59,
      "project_id": 2,
      "task_no": 7,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-07-06",
      "planned_days": 5,
      "planned_cost": 5237.6,
      "status": "complete",
      "overrun_days": 7
    },
    {
      "id": 60,
      "project_id": 2,
      "task_no": 8,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-07-17",
      "planned_days": 34,
      "planned_cost": 46570.33,
      "status": "complete",
      "overrun_days": -1
    },
    {
      "id": 61,
      "project_id": 4,
      "task_no": 14,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-07-02",
      "planned_days": 8,
      "planned_cost": 11918.27,
      "status": "complete",
      "overrun_days": 29
    },
    {
      "id": 62,
      "project_id": 4,
      "task_no": 15,
      "subcontractor_id": 5,
      "trade": "plastering",
      "planned_start": "2025-07-18",
      "planned_days": 39,
      "planned_cost": 63337.82,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 63,
      "project_id": 3,
      "task_no": 7,
      "subcontractor_id": 5,
      "trade": "plastering",
      "planned_start": "2025-07-17",
      "planned_days": 3,
      "planned_cost": 3480.43,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 64,
      "project_id": 4,
      "task_no": 16,
      "subcontractor_id": 6,
      "trade": "scaffolding",
      "planned_start": "2025-07-25",
      "planned_days": 5,
      "planned_cost": 1428.53,
      "status": "complete",
      "overrun_days": -3
    },
    {
      "id": 65,
      "project_id": 2,
      "task_no": 9,
      "subcontractor_id": 6,
      "trade": "scaffolding",
      "planned_start": "2025-07-31",
      "planned_days": 9,
      "planned_cost": 37461.47,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 66,
      "project_id": 2,
      "task_no": 10,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-08-10",
      "planned_days": 4,
      "planned_cost": 124128.26,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 67,
      "project_id": 1,
      "task_no": 10,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-07-20",
      "planned_days": 28,
      "planned_cost": 164574.28,
      "status": "complete",
      "overrun_days": -3
    },
    {
      "id": 68,
      "project_id": 4,
      "task_no": 17,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-08-14",
      "planned_days": 4,
      "planned_cost": 14000.14,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 69,
      "project_id": 4,
      "task_no": 18,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-09-03",
      "planned_days": 3,
      "planned_cost": 168348.43,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 70,
      "project_id": 3,
      "task_no": 8,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-08-04",
      "planned_days": 55,
      "planned_cost": 147343.92,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 71,
      "project_id": 4,
      "task_no": 19,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-09-13",
      "planned_days": 3,
      "planned_cost": 58441.67,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 72,
      "project_id": 2,
      "task_no": 11,
      "subcontractor_id": 10,
      "trade": "flooring",
      "planned_start": "2025-08-16",
      "planned_days": 42,
      "planned_cost": 136867.46,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 73,
      "project_id": 5,
      "task_no": 11,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-09-24",
      "planned_days": 14,
      "planned_cost": 96675.12,
      "status": "complete",
      "overrun_days": 44
    },
    {
      "id": 74,
      "project_id": 2,
      "task_no": 12,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-08-31",
      "planned_days": 3,
      "planned_cost": 17075.65,
      "status": "complete",
      "overrun_days": 8
    },
    {
      "id": 75,
      "project_id": 6,
      "task_no": 15,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-10-31",
      "planned_days": 24,
      "planned_cost": 117705.65,
      "status": "complete",
      "overrun_days": 1
    },
    {
      "id": 76,
      "project_id": 6,
      "task_no": 16,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-11-14",
      "planned_days": 16,
      "planned_cost": 102333.27,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 77,
      "project_id": 1,
      "task_no": 11,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-07-31",
      "planned_days": 29,
      "planned_cost": 55109.84,
      "status": "complete",
      "overrun_days": 33
    },
    {
      "id": 78,
      "project_id": 1,
      "task_no": 12,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-08-19",
      "planned_days": 6,
      "planned_cost": 23908.64,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 79,
      "project_id": 1,
      "task_no": 13,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-08-25",
      "planned_days": 37,
      "planned_cost": 2646.34,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 80,
      "project_id": 3,
      "task_no": 9,
      "subcontractor_id": 9,
      "trade": "glazing",
      "planned_start": "2025-08-19",
      "planned_days": 50,
      "planned_cost": 82194.93,
      "status": "complete",
      "overrun_days": 3
    },
    {
      "id": 81,
      "project_id": 5,
      "task_no": 12,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-10-09",
      "planned_days": 9,
      "planned_cost": 167326.42,
      "status": "complete",
      "overrun_days": 6
    },
    {
      "id": 82,
      "project_id": 4,
      "task_no": 20,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-09-24",
      "planned_days": 11,
      "planned_cost": 11936.29,
      "status": "complete",
      "overrun_days": 21
    },
    {
      "id": 83,
      "project_id": 1,
      "task_no": 14,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-09-03",
      "planned_days": 5,
      "planned_cost": 153505.91,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 84,
      "project_id": 3,
      "task_no": 10,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-08-27",
      "planned_days": 4,
      "planned_cost": 78169.6,
      "status": "complete",
      "overrun_days": -4
    },
    {
      "id": 85,
      "project_id": 2,
      "task_no": 13,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-09-09",
      "planned_days": 6,
      "planned_cost": 34043.59,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 86,
      "project_id": 2,
      "task_no": 14,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-09-26",
      "planned_days": 21,
      "planned_cost": 36097.59,
      "status": "complete",
      "overrun_days": 10
    },
    {
      "id": 87,
      "project_id": 5,
      "task_no": 13,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-10-27",
      "planned_days": 49,
      "planned_cost": 7814.92,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 88,
      "project_id": 2,
      "task_no": 15,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-10-09",
      "planned_days": 4,
      "planned_cost": 116668.59,
      "status": "complete",
      "overrun_days": 3
    },
    {
      "id": 89,
      "project_id": 1,
      "task_no": 15,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-09-20",
      "planned_days": 26,
      "planned_cost": 142428.69,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 90,
      "project_id": 2,
      "task_no": 16,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-10-18",
      "planned_days": 27,
      "planned_cost": 13811.52,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 91,
      "project_id": 1,
      "task_no": 16,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-10-04",
      "planned_days": 5,
      "planned_cost": 17941.14,
      "status": "complete",
      "overrun_days": -4
    },
    {
      "id": 92,
      "project_id": 1,
      "task_no": 17,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2025-10-14",
      "planned_days": 13,
      "planned_cost": 98794.23,
      "status": "complete",
      "overrun_days": 34
    },
    {
      "id": 93,
      "project_id": 5,
      "task_no": 14,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-11-05",
      "planned_days": 4,
      "planned_cost": 1459.33,
      "status": "complete",
      "overrun_days": 35
    },
    {
      "id": 94,
      "project_id": 2,
      "task_no": 17,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-10-27",
      "planned_days": 54,
      "planned_cost": 15258.14,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 95,
      "project_id": 1,
      "task_no": 18,
      "subcontractor_id": 7,
      "trade": "joinery",
      "planned_start": "2025-10-20",
      "planned_days": 4,
      "planned_cost": 93416.5,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 96,
      "project_id": 5,
      "task_no": 15,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-11-11",
      "planned_days": 40,
      "planned_cost": 9263.13,
      "status": "complete",
      "overrun_days": 1
    },
    {
      "id": 97,
      "project_id": 2,
      "task_no": 18,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-11-05",
      "planned_days": 3,
      "planned_cost": 37834.81,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 98,
      "project_id": 2,
      "task_no": 19,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-11-13",
      "planned_days": 38,
      "planned_cost": 51782.8,
      "status": "complete",
      "overrun_days": 34
    },
    {
      "id": 99,
      "project_id": 6,
      "task_no": 17,
      "subcontractor_id": 7,
      "trade": "joinery",
      "planned_start": "2025-12-04",
      "planned_days": 6,
      "planned_cost": 3893.13,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 100,
      "project_id": 6,
      "task_no": 18,
      "subcontractor_id": 6,
      "trade": "scaffolding",
      "planned_start": "2025-12-14",
      "planned_days": 34,
      "planned_cost": 5251.75,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 101,
      "project_id": 3,
      "task_no": 11,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-09-06",
      "planned_days": 4,
      "planned_cost": 9981.62,
      "status": "complete",
      "overrun_days": -2
    },
    {
      "id": 102,
      "project_id": 4,
      "task_no": 21,
      "subcontractor_id": 2,
      "trade": "plumbing",
      "planned_start": "2025-10-03",
      "planned_days": 23,
      "planned_cost": 160159.27,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 103,
      "project_id": 4,
      "task_no": 22,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-10-19",
      "planned_days": 12,
      "planned_cost": 73898.03,
      "status": "complete",
      "overrun_days": 19
    },
    {
      "id": 104,
      "project_id": 3,
      "task_no": 12,
      "subcontractor_id": 7,
      "trade": "joinery",
      "planned_start": "2025-09-13",
      "planned_days": 16,
      "planned_cost": 2718.11,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 105,
      "project_id": 6,
      "task_no": 19,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-12-22",
      "planned_days": 4,
      "planned_cost": 17081.06,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 106,
      "project_id": 3,
      "task_no": 13,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-10-02",
      "planned_days": 3,
      "planned_cost": 118495.33,
      "status": "complete",
      "overrun_days": 7
    },
    {
      "id": 107,
      "project_id": 5,
      "task_no": 16,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-11-24",
      "planned_days": 38,
      "planned_cost": 36100.22,
      "status": "complete",
      "overrun_days": 16
    },
    {
      "id": 108,
      "project_id": 6,
      "task_no": 20,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2026-01-03",
      "planned_days": 17,
      "planned_cost": 84880.97,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 109,
      "project_id": 3,
      "task_no": 14,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-10-14",
      "planned_days": 23,
      "planned_cost": 8192.36,
      "status": "complete",
      "overrun_days": -4
    },
    {
      "id": 110,
      "project_id": 2,
      "task_no": 20,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-11-23",
      "planned_days": 4,
      "planned_cost": 83646.69,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 111,
      "project_id": 2,
      "task_no": 21,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-12-05",
      "planned_days": 26,
      "planned_cost": 22966.88,
      "status": "blocked",
      "overrun_days": null
    },
    {
      "id": 112,
      "project_id": 5,
      "task_no": 17,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-12-02",
      "planned_days": 46,
      "planned_cost": 152846.36,
      "status": "complete",
      "overrun_days": 12
    },
    {
      "id": 113,
      "project_id": 1,
      "task_no": 19,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-11-02",
      "planned_days": 4,
      "planned_cost": 26020.89,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 114,
      "project_id": 4,
      "task_no": 23,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-10-26",
      "planned_days": 5,
      "planned_cost": 19622.8,
      "status": "complete",
      "overrun_days": 2
    },
    {
      "id": 115,
      "project_id": 2,
      "task_no": 22,
      "subcontractor_id": 5,
      "trade": "plastering",
      "planned_start": "2025-12-21",
      "planned_days": 5,
      "planned_cost": 123387.7,
      "status": "in_progress",
      "overrun_days": null
    },
    {
      "id": 116,
      "project_id": 3,
      "task_no": 15,
      "subcontractor_id": 4,
      "trade": "roofing",
      "planned_start": "2025-10-21",
      "planned_days": 40,
      "planned_cost": 34594.83,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 117,
      "project_id": 6,
      "task_no": 21,
      "subcontractor_id": 8,
      "trade": "steelwork",
      "planned_start": "2026-01-17",
      "planned_days": 8,
      "planned_cost": 84989.67,
      "status": "complete",
      "overrun_days": 8
    },
    {
      "id": 118,
      "project_id": 1,
      "task_no": 20,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-11-19",
      "planned_days": 3,
      "planned_cost": 54558.17,
      "status": "complete",
      "overrun_days": -5
    },
    {
      "id": 119,
      "project_id": 5,
      "task_no": 18,
      "subcontractor_id": 3,
      "trade": "groundworks",
      "planned_start": "2025-12-22",
      "planned_days": 3,
      "planned_cost": 52776.6,
      "status": "not_started",
      "overrun_days": null
    },
    {
      "id": 120,
      "project_id": 1,
      "task_no": 21,
      "subcontractor_id": 1,
      "trade": "electrical",
      "planned_start": "2025-11-26",
      "planned_days": 16,
      "planned_cost": 48029,
      "status": "complete",
      "overrun_days": 43
    }
  ],
  "change_orders": [
    {
      "id": 1,
      "task_id": 99,
      "project_id": 6,
      "change_ref": "CO-0525",
      "raised_on": "2025-12-08",
      "reason": "client_request",
      "direction": "addition",
      "value": 38095.98,
      "days_requested": 2,
      "status": "approved",
      "decided_on": "2025-12-13"
    },
    {
      "id": 2,
      "task_id": 59,
      "project_id": 2,
      "change_ref": "CO-6351",
      "raised_on": "2025-08-15",
      "reason": "regulation",
      "direction": "omission",
      "value": 53311.34,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-08-17"
    },
    {
      "id": 3,
      "task_id": 92,
      "project_id": 1,
      "change_ref": "CO-0383",
      "raised_on": "2025-11-25",
      "reason": "regulation",
      "direction": "addition",
      "value": 11523.98,
      "days_requested": 0,
      "status": "approved",
      "decided_on": "2025-12-03"
    },
    {
      "id": 4,
      "task_id": 89,
      "project_id": 1,
      "change_ref": "CO-6260",
      "raised_on": "2025-11-02",
      "reason": "design_error",
      "direction": "addition",
      "value": 18704.17,
      "days_requested": 24,
      "status": "approved",
      "decided_on": "2025-11-28"
    },
    {
      "id": 5,
      "task_id": 102,
      "project_id": 4,
      "change_ref": "CO-7163",
      "raised_on": "2025-10-18",
      "reason": "regulation",
      "direction": "addition",
      "value": 691.74,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-11-07"
    },
    {
      "id": 6,
      "task_id": 1,
      "project_id": 5,
      "change_ref": "CO-4149",
      "raised_on": "2025-07-20",
      "reason": "design_error",
      "direction": "addition",
      "value": 35328.85,
      "days_requested": 27,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 7,
      "task_id": 65,
      "project_id": 2,
      "change_ref": "CO-6157",
      "raised_on": "2025-08-18",
      "reason": "supplier_substitution",
      "direction": "addition",
      "value": 1235.12,
      "days_requested": 12,
      "status": "approved",
      "decided_on": "2025-09-10"
    },
    {
      "id": 8,
      "task_id": 24,
      "project_id": 6,
      "change_ref": "CO-0061",
      "raised_on": "2025-08-20",
      "reason": "client_request",
      "direction": "addition",
      "value": 4073.49,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-09-06"
    },
    {
      "id": 9,
      "task_id": 36,
      "project_id": 6,
      "change_ref": "CO-5780",
      "raised_on": "2025-08-28",
      "reason": "site_condition",
      "direction": "addition",
      "value": 15914.9,
      "days_requested": 9,
      "status": "approved",
      "decided_on": "2025-08-30"
    },
    {
      "id": 10,
      "task_id": 105,
      "project_id": 6,
      "change_ref": "CO-3065",
      "raised_on": "2026-01-07",
      "reason": "site_condition",
      "direction": "addition",
      "value": 4762.9,
      "days_requested": 11,
      "status": "approved",
      "decided_on": "2026-01-11"
    },
    {
      "id": 11,
      "task_id": 40,
      "project_id": 1,
      "change_ref": "CO-3485",
      "raised_on": "2025-05-21",
      "reason": "design_error",
      "direction": "addition",
      "value": 637.82,
      "days_requested": 29,
      "status": "approved",
      "decided_on": "2025-06-15"
    },
    {
      "id": 12,
      "task_id": 6,
      "project_id": 4,
      "change_ref": "CO-1534",
      "raised_on": "2025-02-24",
      "reason": "regulation",
      "direction": "addition",
      "value": 19045.6,
      "days_requested": 0,
      "status": "approved",
      "decided_on": "2025-03-01"
    },
    {
      "id": 13,
      "task_id": 80,
      "project_id": 3,
      "change_ref": "CO-4769",
      "raised_on": "2025-09-10",
      "reason": "client_request",
      "direction": "omission",
      "value": 1810.66,
      "days_requested": 26,
      "status": "approved",
      "decided_on": "2025-10-03"
    },
    {
      "id": 14,
      "task_id": 44,
      "project_id": 4,
      "change_ref": "CO-8242",
      "raised_on": "2025-05-27",
      "reason": "regulation",
      "direction": "addition",
      "value": 486.23,
      "days_requested": 2,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 15,
      "task_id": 76,
      "project_id": 6,
      "change_ref": "CO-0719",
      "raised_on": "2025-11-28",
      "reason": "client_request",
      "direction": "addition",
      "value": 25697.09,
      "days_requested": 2,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 16,
      "task_id": 38,
      "project_id": 6,
      "change_ref": "CO-0830",
      "raised_on": "2025-09-12",
      "reason": "client_request",
      "direction": "addition",
      "value": 7697.72,
      "days_requested": 26,
      "status": "approved",
      "decided_on": "2025-10-04"
    },
    {
      "id": 17,
      "task_id": 51,
      "project_id": 4,
      "change_ref": "CO-2127",
      "raised_on": "2025-06-10",
      "reason": "client_request",
      "direction": "addition",
      "value": 773.23,
      "days_requested": 28,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 18,
      "task_id": 49,
      "project_id": 5,
      "change_ref": "CO-3502",
      "raised_on": "2025-10-03",
      "reason": "design_error",
      "direction": "omission",
      "value": 6203.99,
      "days_requested": 25,
      "status": "approved",
      "decided_on": "2025-10-08"
    },
    {
      "id": 19,
      "task_id": 19,
      "project_id": 5,
      "change_ref": "CO-2708",
      "raised_on": "2025-08-27",
      "reason": "regulation",
      "direction": "addition",
      "value": 432.2,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-09-01"
    },
    {
      "id": 20,
      "task_id": 75,
      "project_id": 6,
      "change_ref": "CO-6024",
      "raised_on": "2025-12-07",
      "reason": "site_condition",
      "direction": "omission",
      "value": 29179.85,
      "days_requested": 19,
      "status": "approved",
      "decided_on": "2025-12-08"
    },
    {
      "id": 21,
      "task_id": 2,
      "project_id": 2,
      "change_ref": "CO-7575",
      "raised_on": "2025-05-18",
      "reason": "regulation",
      "direction": "addition",
      "value": 41224,
      "days_requested": 7,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 22,
      "task_id": 111,
      "project_id": 2,
      "change_ref": "CO-4621",
      "raised_on": "2025-12-06",
      "reason": "client_request",
      "direction": "addition",
      "value": 17522.72,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-12-29"
    },
    {
      "id": 23,
      "task_id": 25,
      "project_id": 6,
      "change_ref": "CO-7248",
      "raised_on": "2025-07-29",
      "reason": "design_error",
      "direction": "addition",
      "value": 4807.48,
      "days_requested": 2,
      "status": "approved",
      "decided_on": "2025-08-27"
    },
    {
      "id": 24,
      "task_id": 84,
      "project_id": 3,
      "change_ref": "CO-4761",
      "raised_on": "2025-09-06",
      "reason": "design_error",
      "direction": "omission",
      "value": 41553.84,
      "days_requested": 10,
      "status": "approved",
      "decided_on": "2025-09-26"
    },
    {
      "id": 25,
      "task_id": 23,
      "project_id": 5,
      "change_ref": "CO-7962",
      "raised_on": "2025-08-15",
      "reason": "client_request",
      "direction": "addition",
      "value": 41052.45,
      "days_requested": 1,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 26,
      "task_id": 14,
      "project_id": 6,
      "change_ref": "CO-7249",
      "raised_on": "2025-07-23",
      "reason": "design_error",
      "direction": "addition",
      "value": 40429.19,
      "days_requested": 10,
      "status": "approved",
      "decided_on": "2025-08-22"
    },
    {
      "id": 27,
      "task_id": 29,
      "project_id": 6,
      "change_ref": "CO-3862",
      "raised_on": "2025-09-05",
      "reason": "client_request",
      "direction": "addition",
      "value": 445.85,
      "days_requested": 0,
      "status": "approved",
      "decided_on": "2025-09-18"
    },
    {
      "id": 28,
      "task_id": 104,
      "project_id": 3,
      "change_ref": "CO-1895",
      "raised_on": "2025-10-14",
      "reason": "regulation",
      "direction": "addition",
      "value": 30278.92,
      "days_requested": 2,
      "status": "approved",
      "decided_on": "2025-11-05"
    },
    {
      "id": 29,
      "task_id": 107,
      "project_id": 5,
      "change_ref": "CO-0446",
      "raised_on": "2025-12-17",
      "reason": "design_error",
      "direction": "addition",
      "value": 403.56,
      "days_requested": 8,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 30,
      "task_id": 64,
      "project_id": 4,
      "change_ref": "CO-1351",
      "raised_on": "2025-08-25",
      "reason": "client_request",
      "direction": "omission",
      "value": 13980.56,
      "days_requested": 1,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 31,
      "task_id": 61,
      "project_id": 4,
      "change_ref": "CO-1653",
      "raised_on": "2025-07-24",
      "reason": "regulation",
      "direction": "addition",
      "value": 20848.89,
      "days_requested": 0,
      "status": "approved",
      "decided_on": "2025-08-18"
    },
    {
      "id": 32,
      "task_id": 88,
      "project_id": 2,
      "change_ref": "CO-3413",
      "raised_on": "2025-11-21",
      "reason": "client_request",
      "direction": "addition",
      "value": 20688.88,
      "days_requested": 0,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 33,
      "task_id": 119,
      "project_id": 5,
      "change_ref": "CO-5840",
      "raised_on": "2026-01-18",
      "reason": "client_request",
      "direction": "addition",
      "value": 51945.36,
      "days_requested": 10,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 34,
      "task_id": 30,
      "project_id": 3,
      "change_ref": "CO-7462",
      "raised_on": "2025-07-29",
      "reason": "site_condition",
      "direction": "addition",
      "value": 56142.37,
      "days_requested": 3,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 35,
      "task_id": 15,
      "project_id": 5,
      "change_ref": "CO-2199",
      "raised_on": "2025-06-27",
      "reason": "client_request",
      "direction": "addition",
      "value": 51897.42,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-07-07"
    },
    {
      "id": 36,
      "task_id": 85,
      "project_id": 2,
      "change_ref": "CO-0487",
      "raised_on": "2025-10-14",
      "reason": "regulation",
      "direction": "addition",
      "value": 27810.18,
      "days_requested": 0,
      "status": "rejected",
      "decided_on": "2025-10-31"
    },
    {
      "id": 37,
      "task_id": 63,
      "project_id": 3,
      "change_ref": "CO-0821",
      "raised_on": "2025-07-27",
      "reason": "design_error",
      "direction": "addition",
      "value": 4119.12,
      "days_requested": 8,
      "status": "approved",
      "decided_on": "2025-08-19"
    },
    {
      "id": 38,
      "task_id": 3,
      "project_id": 3,
      "change_ref": "CO-9152",
      "raised_on": "2025-04-29",
      "reason": "regulation",
      "direction": "addition",
      "value": 1093.09,
      "days_requested": 0,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 39,
      "task_id": 60,
      "project_id": 2,
      "change_ref": "CO-5778",
      "raised_on": "2025-08-01",
      "reason": "supplier_substitution",
      "direction": "addition",
      "value": 29169.53,
      "days_requested": 15,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 40,
      "task_id": 50,
      "project_id": 4,
      "change_ref": "CO-3200",
      "raised_on": "2025-06-05",
      "reason": "client_request",
      "direction": "addition",
      "value": 29697.73,
      "days_requested": 5,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 41,
      "task_id": 57,
      "project_id": 4,
      "change_ref": "CO-5524",
      "raised_on": "2025-07-01",
      "reason": "design_error",
      "direction": "addition",
      "value": 8212.32,
      "days_requested": 6,
      "status": "approved",
      "decided_on": "2025-07-18"
    },
    {
      "id": 42,
      "task_id": 62,
      "project_id": 4,
      "change_ref": "CO-3515",
      "raised_on": "2025-07-31",
      "reason": "site_condition",
      "direction": "addition",
      "value": 641.06,
      "days_requested": 18,
      "status": "approved",
      "decided_on": "2025-08-02"
    },
    {
      "id": 43,
      "task_id": 78,
      "project_id": 1,
      "change_ref": "CO-3188",
      "raised_on": "2025-08-29",
      "reason": "site_condition",
      "direction": "addition",
      "value": 9927.39,
      "days_requested": 2,
      "status": "approved",
      "decided_on": "2025-09-24"
    },
    {
      "id": 44,
      "task_id": 68,
      "project_id": 4,
      "change_ref": "CO-3360",
      "raised_on": "2025-08-23",
      "reason": "design_error",
      "direction": "addition",
      "value": 15923.95,
      "days_requested": 20,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 45,
      "task_id": 116,
      "project_id": 3,
      "change_ref": "CO-0956",
      "raised_on": "2025-10-30",
      "reason": "client_request",
      "direction": "addition",
      "value": 23167.66,
      "days_requested": 13,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 46,
      "task_id": 97,
      "project_id": 2,
      "change_ref": "CO-1239",
      "raised_on": "2025-11-11",
      "reason": "client_request",
      "direction": "omission",
      "value": 20779.29,
      "days_requested": 26,
      "status": "approved",
      "decided_on": "2025-11-12"
    },
    {
      "id": 47,
      "task_id": 43,
      "project_id": 2,
      "change_ref": "CO-7564",
      "raised_on": "2025-06-20",
      "reason": "design_error",
      "direction": "omission",
      "value": 24427.11,
      "days_requested": 22,
      "status": "approved",
      "decided_on": "2025-07-12"
    },
    {
      "id": 48,
      "task_id": 33,
      "project_id": 1,
      "change_ref": "CO-9431",
      "raised_on": "2025-04-23",
      "reason": "design_error",
      "direction": "addition",
      "value": 58398.79,
      "days_requested": 8,
      "status": "approved",
      "decided_on": "2025-05-09"
    },
    {
      "id": 49,
      "task_id": 58,
      "project_id": 1,
      "change_ref": "CO-0373",
      "raised_on": "2025-08-13",
      "reason": "site_condition",
      "direction": "addition",
      "value": 42957.51,
      "days_requested": 14,
      "status": "approved",
      "decided_on": "2025-08-27"
    },
    {
      "id": 50,
      "task_id": 52,
      "project_id": 6,
      "change_ref": "CO-8734",
      "raised_on": "2025-11-18",
      "reason": "site_condition",
      "direction": "addition",
      "value": 32455.78,
      "days_requested": 1,
      "status": "approved",
      "decided_on": "2025-12-09"
    },
    {
      "id": 51,
      "task_id": 66,
      "project_id": 2,
      "change_ref": "CO-9654",
      "raised_on": "2025-09-14",
      "reason": "site_condition",
      "direction": "addition",
      "value": 2367.31,
      "days_requested": 30,
      "status": "approved",
      "decided_on": "2025-10-02"
    },
    {
      "id": 52,
      "task_id": 7,
      "project_id": 5,
      "change_ref": "CO-9893",
      "raised_on": "2025-06-29",
      "reason": "client_request",
      "direction": "addition",
      "value": 56801.25,
      "days_requested": 24,
      "status": "approved",
      "decided_on": "2025-07-23"
    },
    {
      "id": 53,
      "task_id": 39,
      "project_id": 6,
      "change_ref": "CO-9160",
      "raised_on": "2025-10-04",
      "reason": "regulation",
      "direction": "addition",
      "value": 46622.91,
      "days_requested": 29,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 54,
      "task_id": 94,
      "project_id": 2,
      "change_ref": "CO-1592",
      "raised_on": "2025-12-06",
      "reason": "client_request",
      "direction": "addition",
      "value": 15178.45,
      "days_requested": 0,
      "status": "rejected",
      "decided_on": "2025-12-24"
    },
    {
      "id": 55,
      "task_id": 120,
      "project_id": 1,
      "change_ref": "CO-1595",
      "raised_on": "2025-12-26",
      "reason": "regulation",
      "direction": "addition",
      "value": 830.99,
      "days_requested": 6,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 56,
      "task_id": 81,
      "project_id": 5,
      "change_ref": "CO-4708",
      "raised_on": "2025-10-10",
      "reason": "client_request",
      "direction": "addition",
      "value": 50587.37,
      "days_requested": 3,
      "status": "approved",
      "decided_on": "2025-10-25"
    },
    {
      "id": 57,
      "task_id": 4,
      "project_id": 1,
      "change_ref": "CO-8200",
      "raised_on": "2025-04-04",
      "reason": "client_request",
      "direction": "addition",
      "value": 22735.41,
      "days_requested": 16,
      "status": "approved",
      "decided_on": "2025-04-10"
    },
    {
      "id": 58,
      "task_id": 91,
      "project_id": 1,
      "change_ref": "CO-0569",
      "raised_on": "2025-10-19",
      "reason": "site_condition",
      "direction": "addition",
      "value": 2787.91,
      "days_requested": 20,
      "status": "pending",
      "decided_on": null
    },
    {
      "id": 59,
      "task_id": 70,
      "project_id": 3,
      "change_ref": "CO-7975",
      "raised_on": "2025-09-17",
      "reason": "regulation",
      "direction": "addition",
      "value": 27188.37,
      "days_requested": 0,
      "status": "approved",
      "decided_on": "2025-10-08"
    },
    {
      "id": 60,
      "task_id": 48,
      "project_id": 4,
      "change_ref": "CO-3655",
      "raised_on": "2025-05-07",
      "reason": "client_request",
      "direction": "addition",
      "value": 973.17,
      "days_requested": 15,
      "status": "withdrawn",
      "decided_on": null
    },
    {
      "id": 61,
      "task_id": 13,
      "project_id": 4,
      "change_ref": "CO-4191",
      "raised_on": "2025-03-29",
      "reason": "site_condition",
      "direction": "omission",
      "value": 26789.25,
      "days_requested": 7,
      "status": "rejected",
      "decided_on": "2025-04-18"
    },
    {
      "id": 62,
      "task_id": 114,
      "project_id": 4,
      "change_ref": "CO-3225",
      "raised_on": "2025-11-28",
      "reason": "supplier_substitution",
      "direction": "omission",
      "value": 34082.14,
      "days_requested": 6,
      "status": "approved",
      "decided_on": "2025-11-30"
    },
    {
      "id": 63,
      "task_id": 56,
      "project_id": 5,
      "change_ref": "CO-4147",
      "raised_on": "2025-10-07",
      "reason": "regulation",
      "direction": "omission",
      "value": 3455.69,
      "days_requested": 22,
      "status": "approved",
      "decided_on": "2025-10-19"
    },
    {
      "id": 64,
      "task_id": 55,
      "project_id": 5,
      "change_ref": "CO-8366",
      "raised_on": "2025-09-27",
      "reason": "design_error",
      "direction": "omission",
      "value": 403.89,
      "days_requested": 5,
      "status": "approved",
      "decided_on": "2025-10-11"
    }
  ],
  "deliveries": [
    {
      "id": 1,
      "task_id": 49,
      "material_id": 1,
      "delivered_on": "2025-09-02",
      "quantity": 9,
      "unit_price": 118,
      "line_cost": 1062
    },
    {
      "id": 2,
      "task_id": 4,
      "material_id": 9,
      "delivered_on": "2025-03-20",
      "quantity": 41,
      "unit_price": 8.6,
      "line_cost": 352.6
    },
    {
      "id": 3,
      "task_id": 69,
      "material_id": 7,
      "delivered_on": "2025-09-04",
      "quantity": 1,
      "unit_price": 21.5,
      "line_cost": 21.5
    },
    {
      "id": 4,
      "task_id": 95,
      "material_id": 1,
      "delivered_on": "2025-10-29",
      "quantity": 3,
      "unit_price": 118,
      "line_cost": 354
    },
    {
      "id": 5,
      "task_id": 108,
      "material_id": 6,
      "delivered_on": "2026-01-08",
      "quantity": 59,
      "unit_price": 9.4,
      "line_cost": 554.6
    },
    {
      "id": 6,
      "task_id": 113,
      "material_id": 2,
      "delivered_on": "2025-11-07",
      "quantity": 46,
      "unit_price": 780,
      "line_cost": 35880
    },
    {
      "id": 7,
      "task_id": 58,
      "material_id": 12,
      "delivered_on": "2025-07-06",
      "quantity": 15,
      "unit_price": 280,
      "line_cost": 4200
    },
    {
      "id": 8,
      "task_id": 39,
      "material_id": 2,
      "delivered_on": "2025-10-07",
      "quantity": 1,
      "unit_price": 780,
      "line_cost": 780
    },
    {
      "id": 9,
      "task_id": 7,
      "material_id": 1,
      "delivered_on": "2025-07-17",
      "quantity": 7,
      "unit_price": 118,
      "line_cost": 826
    },
    {
      "id": 10,
      "task_id": 92,
      "material_id": 1,
      "delivered_on": "2025-10-21",
      "quantity": 12,
      "unit_price": 118,
      "line_cost": 1416
    },
    {
      "id": 11,
      "task_id": 63,
      "material_id": 2,
      "delivered_on": "2025-08-01",
      "quantity": 3,
      "unit_price": 780,
      "line_cost": 2340
    },
    {
      "id": 12,
      "task_id": 25,
      "material_id": 10,
      "delivered_on": "2025-08-13",
      "quantity": 59,
      "unit_price": 165,
      "line_cost": 9735
    },
    {
      "id": 13,
      "task_id": 35,
      "material_id": 11,
      "delivered_on": "2025-06-13",
      "quantity": 4,
      "unit_price": 5.2,
      "line_cost": 20.8
    },
    {
      "id": 14,
      "task_id": 69,
      "material_id": 1,
      "delivered_on": "2025-09-17",
      "quantity": 8,
      "unit_price": 118,
      "line_cost": 944
    },
    {
      "id": 15,
      "task_id": 63,
      "material_id": 2,
      "delivered_on": "2025-08-16",
      "quantity": 58,
      "unit_price": 780,
      "line_cost": 45240
    },
    {
      "id": 16,
      "task_id": 104,
      "material_id": 10,
      "delivered_on": "2025-10-08",
      "quantity": 3,
      "unit_price": 165,
      "line_cost": 495
    },
    {
      "id": 17,
      "task_id": 73,
      "material_id": 1,
      "delivered_on": "2025-10-15",
      "quantity": 6,
      "unit_price": 118,
      "line_cost": 708
    },
    {
      "id": 18,
      "task_id": 101,
      "material_id": 11,
      "delivered_on": "2025-09-23",
      "quantity": 2,
      "unit_price": 5.2,
      "line_cost": 10.4
    },
    {
      "id": 19,
      "task_id": 114,
      "material_id": 4,
      "delivered_on": "2025-11-13",
      "quantity": 27,
      "unit_price": 640,
      "line_cost": 17280
    },
    {
      "id": 20,
      "task_id": 118,
      "material_id": 1,
      "delivered_on": "2025-11-23",
      "quantity": 56,
      "unit_price": 118,
      "line_cost": 6608
    },
    {
      "id": 21,
      "task_id": 50,
      "material_id": 6,
      "delivered_on": "2025-06-12",
      "quantity": 31,
      "unit_price": 9.4,
      "line_cost": 291.4
    },
    {
      "id": 22,
      "task_id": 10,
      "material_id": 2,
      "delivered_on": "2025-06-18",
      "quantity": 2,
      "unit_price": 780,
      "line_cost": 1560
    },
    {
      "id": 23,
      "task_id": 111,
      "material_id": 10,
      "delivered_on": "2025-12-25",
      "quantity": 20,
      "unit_price": 165,
      "line_cost": 3300
    },
    {
      "id": 24,
      "task_id": 55,
      "material_id": 1,
      "delivered_on": "2025-09-21",
      "quantity": 20,
      "unit_price": 118,
      "line_cost": 2360
    },
    {
      "id": 25,
      "task_id": 34,
      "material_id": 6,
      "delivered_on": "2025-05-30",
      "quantity": 27,
      "unit_price": 9.4,
      "line_cost": 253.8
    },
    {
      "id": 26,
      "task_id": 95,
      "material_id": 5,
      "delivered_on": "2025-10-28",
      "quantity": 7,
      "unit_price": 215,
      "line_cost": 1505
    },
    {
      "id": 27,
      "task_id": 11,
      "material_id": 1,
      "delivered_on": "2025-03-22",
      "quantity": 26,
      "unit_price": 118,
      "line_cost": 3068
    },
    {
      "id": 28,
      "task_id": 75,
      "material_id": 14,
      "delivered_on": "2025-11-26",
      "quantity": 1,
      "unit_price": 54,
      "line_cost": 54
    },
    {
      "id": 29,
      "task_id": 83,
      "material_id": 1,
      "delivered_on": "2025-09-08",
      "quantity": 41,
      "unit_price": 118,
      "line_cost": 4838
    },
    {
      "id": 30,
      "task_id": 25,
      "material_id": 12,
      "delivered_on": "2025-08-05",
      "quantity": 1,
      "unit_price": 280,
      "line_cost": 280
    },
    {
      "id": 31,
      "task_id": 24,
      "material_id": 13,
      "delivered_on": "2025-08-10",
      "quantity": 4,
      "unit_price": 6.8,
      "line_cost": 27.2
    },
    {
      "id": 32,
      "task_id": 98,
      "material_id": 1,
      "delivered_on": "2025-12-13",
      "quantity": 24,
      "unit_price": 118,
      "line_cost": 2832
    },
    {
      "id": 33,
      "task_id": 19,
      "material_id": 2,
      "delivered_on": "2025-08-09",
      "quantity": 57,
      "unit_price": 780,
      "line_cost": 44460
    },
    {
      "id": 34,
      "task_id": 78,
      "material_id": 1,
      "delivered_on": "2025-08-20",
      "quantity": 7,
      "unit_price": 118,
      "line_cost": 826
    },
    {
      "id": 35,
      "task_id": 64,
      "material_id": 12,
      "delivered_on": "2025-08-23",
      "quantity": 8,
      "unit_price": 280,
      "line_cost": 2240
    },
    {
      "id": 36,
      "task_id": 78,
      "material_id": 9,
      "delivered_on": "2025-09-12",
      "quantity": 54,
      "unit_price": 8.6,
      "line_cost": 464.4
    },
    {
      "id": 37,
      "task_id": 12,
      "material_id": 6,
      "delivered_on": "2025-05-17",
      "quantity": 19,
      "unit_price": 9.4,
      "line_cost": 178.6
    },
    {
      "id": 38,
      "task_id": 25,
      "material_id": 10,
      "delivered_on": "2025-08-18",
      "quantity": 21,
      "unit_price": 165,
      "line_cost": 3465
    },
    {
      "id": 39,
      "task_id": 60,
      "material_id": 6,
      "delivered_on": "2025-07-21",
      "quantity": 59,
      "unit_price": 9.4,
      "line_cost": 554.6
    },
    {
      "id": 40,
      "task_id": 103,
      "material_id": 9,
      "delivered_on": "2025-11-18",
      "quantity": 1,
      "unit_price": 8.6,
      "line_cost": 8.6
    },
    {
      "id": 41,
      "task_id": 43,
      "material_id": 11,
      "delivered_on": "2025-06-16",
      "quantity": 15,
      "unit_price": 5.2,
      "line_cost": 78
    },
    {
      "id": 42,
      "task_id": 30,
      "material_id": 7,
      "delivered_on": "2025-07-05",
      "quantity": 34,
      "unit_price": 21.5,
      "line_cost": 731
    },
    {
      "id": 43,
      "task_id": 49,
      "material_id": 13,
      "delivered_on": "2025-09-18",
      "quantity": 30,
      "unit_price": 6.8,
      "line_cost": 204
    },
    {
      "id": 44,
      "task_id": 65,
      "material_id": 5,
      "delivered_on": "2025-08-11",
      "quantity": 17,
      "unit_price": 215,
      "line_cost": 3655
    },
    {
      "id": 45,
      "task_id": 46,
      "material_id": 1,
      "delivered_on": "2025-10-24",
      "quantity": 2,
      "unit_price": 118,
      "line_cost": 236
    },
    {
      "id": 46,
      "task_id": 74,
      "material_id": 4,
      "delivered_on": "2025-09-10",
      "quantity": 21,
      "unit_price": 640,
      "line_cost": 13440
    },
    {
      "id": 47,
      "task_id": 43,
      "material_id": 4,
      "delivered_on": "2025-07-03",
      "quantity": 47,
      "unit_price": 640,
      "line_cost": 30080
    },
    {
      "id": 48,
      "task_id": 117,
      "material_id": 4,
      "delivered_on": "2026-01-21",
      "quantity": 4,
      "unit_price": 640,
      "line_cost": 2560
    },
    {
      "id": 49,
      "task_id": 32,
      "material_id": 6,
      "delivered_on": "2025-09-08",
      "quantity": 2,
      "unit_price": 9.4,
      "line_cost": 18.8
    },
    {
      "id": 50,
      "task_id": 42,
      "material_id": 4,
      "delivered_on": "2025-04-16",
      "quantity": 46,
      "unit_price": 640,
      "line_cost": 29440
    },
    {
      "id": 51,
      "task_id": 108,
      "material_id": 1,
      "delivered_on": "2026-01-29",
      "quantity": 9,
      "unit_price": 118,
      "line_cost": 1062
    },
    {
      "id": 52,
      "task_id": 87,
      "material_id": 2,
      "delivered_on": "2025-11-05",
      "quantity": 2,
      "unit_price": 780,
      "line_cost": 1560
    },
    {
      "id": 53,
      "task_id": 118,
      "material_id": 12,
      "delivered_on": "2025-11-29",
      "quantity": 3,
      "unit_price": 280,
      "line_cost": 840
    },
    {
      "id": 54,
      "task_id": 56,
      "material_id": 6,
      "delivered_on": "2025-10-16",
      "quantity": 20,
      "unit_price": 9.4,
      "line_cost": 188
    },
    {
      "id": 55,
      "task_id": 47,
      "material_id": 10,
      "delivered_on": "2025-10-18",
      "quantity": 16,
      "unit_price": 165,
      "line_cost": 2640
    },
    {
      "id": 56,
      "task_id": 33,
      "material_id": 5,
      "delivered_on": "2025-05-02",
      "quantity": 4,
      "unit_price": 215,
      "line_cost": 860
    },
    {
      "id": 57,
      "task_id": 55,
      "material_id": 11,
      "delivered_on": "2025-09-28",
      "quantity": 30,
      "unit_price": 5.2,
      "line_cost": 156
    },
    {
      "id": 58,
      "task_id": 43,
      "material_id": 11,
      "delivered_on": "2025-06-14",
      "quantity": 14,
      "unit_price": 5.2,
      "line_cost": 72.8
    },
    {
      "id": 59,
      "task_id": 41,
      "material_id": 8,
      "delivered_on": "2025-06-28",
      "quantity": 1,
      "unit_price": 34,
      "line_cost": 34
    },
    {
      "id": 60,
      "task_id": 67,
      "material_id": 1,
      "delivered_on": "2025-08-05",
      "quantity": 5,
      "unit_price": 118,
      "line_cost": 590
    },
    {
      "id": 61,
      "task_id": 105,
      "material_id": 2,
      "delivered_on": "2025-12-25",
      "quantity": 1,
      "unit_price": 780,
      "line_cost": 780
    },
    {
      "id": 62,
      "task_id": 37,
      "material_id": 9,
      "delivered_on": "2025-05-30",
      "quantity": 16,
      "unit_price": 8.6,
      "line_cost": 137.6
    },
    {
      "id": 63,
      "task_id": 7,
      "material_id": 1,
      "delivered_on": "2025-06-17",
      "quantity": 40,
      "unit_price": 118,
      "line_cost": 4720
    },
    {
      "id": 64,
      "task_id": 59,
      "material_id": 1,
      "delivered_on": "2025-07-27",
      "quantity": 11,
      "unit_price": 118,
      "line_cost": 1298
    },
    {
      "id": 65,
      "task_id": 4,
      "material_id": 3,
      "delivered_on": "2025-03-26",
      "quantity": 1,
      "unit_price": 1250,
      "line_cost": 1250
    },
    {
      "id": 66,
      "task_id": 17,
      "material_id": 8,
      "delivered_on": "2025-06-11",
      "quantity": 5,
      "unit_price": 34,
      "line_cost": 170
    },
    {
      "id": 67,
      "task_id": 110,
      "material_id": 1,
      "delivered_on": "2025-11-26",
      "quantity": 6,
      "unit_price": 118,
      "line_cost": 708
    },
    {
      "id": 68,
      "task_id": 101,
      "material_id": 1,
      "delivered_on": "2025-10-02",
      "quantity": 25,
      "unit_price": 118,
      "line_cost": 2950
    },
    {
      "id": 69,
      "task_id": 62,
      "material_id": 5,
      "delivered_on": "2025-07-25",
      "quantity": 10,
      "unit_price": 215,
      "line_cost": 2150
    },
    {
      "id": 70,
      "task_id": 21,
      "material_id": 5,
      "delivered_on": "2025-04-07",
      "quantity": 31,
      "unit_price": 215,
      "line_cost": 6665
    },
    {
      "id": 71,
      "task_id": 52,
      "material_id": 2,
      "delivered_on": "2025-10-23",
      "quantity": 2,
      "unit_price": 780,
      "line_cost": 1560
    },
    {
      "id": 72,
      "task_id": 60,
      "material_id": 2,
      "delivered_on": "2025-08-09",
      "quantity": 8,
      "unit_price": 780,
      "line_cost": 6240
    },
    {
      "id": 73,
      "task_id": 19,
      "material_id": 10,
      "delivered_on": "2025-07-21",
      "quantity": 8,
      "unit_price": 165,
      "line_cost": 1320
    },
    {
      "id": 74,
      "task_id": 108,
      "material_id": 9,
      "delivered_on": "2026-01-12",
      "quantity": 30,
      "unit_price": 8.6,
      "line_cost": 258
    },
    {
      "id": 75,
      "task_id": 80,
      "material_id": 9,
      "delivered_on": "2025-08-22",
      "quantity": 35,
      "unit_price": 8.6,
      "line_cost": 301
    },
    {
      "id": 76,
      "task_id": 96,
      "material_id": 2,
      "delivered_on": "2025-12-07",
      "quantity": 1,
      "unit_price": 780,
      "line_cost": 780
    },
    {
      "id": 77,
      "task_id": 35,
      "material_id": 12,
      "delivered_on": "2025-06-07",
      "quantity": 47,
      "unit_price": 280,
      "line_cost": 13160
    },
    {
      "id": 78,
      "task_id": 87,
      "material_id": 1,
      "delivered_on": "2025-11-05",
      "quantity": 49,
      "unit_price": 118,
      "line_cost": 5782
    },
    {
      "id": 79,
      "task_id": 55,
      "material_id": 3,
      "delivered_on": "2025-09-27",
      "quantity": 10,
      "unit_price": 1250,
      "line_cost": 12500
    },
    {
      "id": 80,
      "task_id": 69,
      "material_id": 6,
      "delivered_on": "2025-09-04",
      "quantity": 30,
      "unit_price": 9.4,
      "line_cost": 282
    },
    {
      "id": 81,
      "task_id": 79,
      "material_id": 1,
      "delivered_on": "2025-08-30",
      "quantity": 21,
      "unit_price": 118,
      "line_cost": 2478
    },
    {
      "id": 82,
      "task_id": 51,
      "material_id": 11,
      "delivered_on": "2025-06-07",
      "quantity": 1,
      "unit_price": 5.2,
      "line_cost": 5.2
    },
    {
      "id": 83,
      "task_id": 57,
      "material_id": 1,
      "delivered_on": "2025-07-07",
      "quantity": 1,
      "unit_price": 118,
      "line_cost": 118
    },
    {
      "id": 84,
      "task_id": 20,
      "material_id": 1,
      "delivered_on": "2025-07-15",
      "quantity": 7,
      "unit_price": 118,
      "line_cost": 826
    },
    {
      "id": 85,
      "task_id": 44,
      "material_id": 11,
      "delivered_on": "2025-05-15",
      "quantity": 33,
      "unit_price": 5.2,
      "line_cost": 171.6
    },
    {
      "id": 86,
      "task_id": 49,
      "material_id": 4,
      "delivered_on": "2025-09-16",
      "quantity": 7,
      "unit_price": 640,
      "line_cost": 4480
    },
    {
      "id": 87,
      "task_id": 30,
      "material_id": 1,
      "delivered_on": "2025-07-04",
      "quantity": 27,
      "unit_price": 118,
      "line_cost": 3186
    },
    {
      "id": 88,
      "task_id": 100,
      "material_id": 9,
      "delivered_on": "2025-12-27",
      "quantity": 42,
      "unit_price": 8.6,
      "line_cost": 361.2
    },
    {
      "id": 89,
      "task_id": 80,
      "material_id": 10,
      "delivered_on": "2025-08-28",
      "quantity": 33,
      "unit_price": 165,
      "line_cost": 5445
    },
    {
      "id": 90,
      "task_id": 38,
      "material_id": 4,
      "delivered_on": "2025-09-10",
      "quantity": 15,
      "unit_price": 640,
      "line_cost": 9600
    },
    {
      "id": 91,
      "task_id": 59,
      "material_id": 2,
      "delivered_on": "2025-07-27",
      "quantity": 38,
      "unit_price": 780,
      "line_cost": 29640
    },
    {
      "id": 92,
      "task_id": 73,
      "material_id": 12,
      "delivered_on": "2025-10-05",
      "quantity": 18,
      "unit_price": 280,
      "line_cost": 5040
    },
    {
      "id": 93,
      "task_id": 9,
      "material_id": 1,
      "delivered_on": "2025-03-27",
      "quantity": 52,
      "unit_price": 118,
      "line_cost": 6136
    },
    {
      "id": 94,
      "task_id": 94,
      "material_id": 14,
      "delivered_on": "2025-11-04",
      "quantity": 57,
      "unit_price": 54,
      "line_cost": 3078
    },
    {
      "id": 95,
      "task_id": 45,
      "material_id": 1,
      "delivered_on": "2025-06-29",
      "quantity": 51,
      "unit_price": 118,
      "line_cost": 6018
    },
    {
      "id": 96,
      "task_id": 59,
      "material_id": 4,
      "delivered_on": "2025-07-26",
      "quantity": 14,
      "unit_price": 640,
      "line_cost": 8960
    },
    {
      "id": 97,
      "task_id": 56,
      "material_id": 3,
      "delivered_on": "2025-09-27",
      "quantity": 5,
      "unit_price": 1250,
      "line_cost": 6250
    },
    {
      "id": 98,
      "task_id": 57,
      "material_id": 7,
      "delivered_on": "2025-07-08",
      "quantity": 8,
      "unit_price": 21.5,
      "line_cost": 172
    },
    {
      "id": 99,
      "task_id": 32,
      "material_id": 9,
      "delivered_on": "2025-09-01",
      "quantity": 20,
      "unit_price": 8.6,
      "line_cost": 172
    },
    {
      "id": 100,
      "task_id": 89,
      "material_id": 14,
      "delivered_on": "2025-10-16",
      "quantity": 2,
      "unit_price": 54,
      "line_cost": 108
    },
    {
      "id": 101,
      "task_id": 17,
      "material_id": 10,
      "delivered_on": "2025-06-06",
      "quantity": 1,
      "unit_price": 165,
      "line_cost": 165
    },
    {
      "id": 102,
      "task_id": 103,
      "material_id": 1,
      "delivered_on": "2025-10-29",
      "quantity": 43,
      "unit_price": 118,
      "line_cost": 5074
    },
    {
      "id": 103,
      "task_id": 51,
      "material_id": 7,
      "delivered_on": "2025-06-20",
      "quantity": 32,
      "unit_price": 21.5,
      "line_cost": 688
    },
    {
      "id": 104,
      "task_id": 4,
      "material_id": 4,
      "delivered_on": "2025-03-14",
      "quantity": 48,
      "unit_price": 640,
      "line_cost": 30720
    },
    {
      "id": 105,
      "task_id": 72,
      "material_id": 13,
      "delivered_on": "2025-09-05",
      "quantity": 6,
      "unit_price": 6.8,
      "line_cost": 40.8
    },
    {
      "id": 106,
      "task_id": 21,
      "material_id": 2,
      "delivered_on": "2025-04-03",
      "quantity": 18,
      "unit_price": 780,
      "line_cost": 14040
    },
    {
      "id": 107,
      "task_id": 100,
      "material_id": 2,
      "delivered_on": "2026-01-06",
      "quantity": 28,
      "unit_price": 780,
      "line_cost": 21840
    },
    {
      "id": 108,
      "task_id": 104,
      "material_id": 9,
      "delivered_on": "2025-10-07",
      "quantity": 32,
      "unit_price": 8.6,
      "line_cost": 275.2
    },
    {
      "id": 109,
      "task_id": 32,
      "material_id": 2,
      "delivered_on": "2025-08-22",
      "quantity": 35,
      "unit_price": 780,
      "line_cost": 27300
    },
    {
      "id": 110,
      "task_id": 46,
      "material_id": 9,
      "delivered_on": "2025-10-20",
      "quantity": 27,
      "unit_price": 8.6,
      "line_cost": 232.2
    },
    {
      "id": 111,
      "task_id": 26,
      "material_id": 7,
      "delivered_on": "2025-04-30",
      "quantity": 8,
      "unit_price": 21.5,
      "line_cost": 172
    },
    {
      "id": 112,
      "task_id": 17,
      "material_id": 3,
      "delivered_on": "2025-05-18",
      "quantity": 16,
      "unit_price": 1250,
      "line_cost": 20000
    },
    {
      "id": 113,
      "task_id": 3,
      "material_id": 7,
      "delivered_on": "2025-04-27",
      "quantity": 11,
      "unit_price": 21.5,
      "line_cost": 236.5
    },
    {
      "id": 114,
      "task_id": 63,
      "material_id": 14,
      "delivered_on": "2025-08-09",
      "quantity": 16,
      "unit_price": 54,
      "line_cost": 864
    },
    {
      "id": 115,
      "task_id": 56,
      "material_id": 1,
      "delivered_on": "2025-10-01",
      "quantity": 4,
      "unit_price": 118,
      "line_cost": 472
    },
    {
      "id": 116,
      "task_id": 79,
      "material_id": 2,
      "delivered_on": "2025-09-09",
      "quantity": 5,
      "unit_price": 780,
      "line_cost": 3900
    },
    {
      "id": 117,
      "task_id": 31,
      "material_id": 3,
      "delivered_on": "2025-09-03",
      "quantity": 19,
      "unit_price": 1250,
      "line_cost": 23750
    },
    {
      "id": 118,
      "task_id": 94,
      "material_id": 6,
      "delivered_on": "2025-11-11",
      "quantity": 32,
      "unit_price": 9.4,
      "line_cost": 300.8
    },
    {
      "id": 119,
      "task_id": 114,
      "material_id": 2,
      "delivered_on": "2025-11-16",
      "quantity": 12,
      "unit_price": 780,
      "line_cost": 9360
    },
    {
      "id": 120,
      "task_id": 92,
      "material_id": 3,
      "delivered_on": "2025-10-26",
      "quantity": 10,
      "unit_price": 1250,
      "line_cost": 12500
    },
    {
      "id": 121,
      "task_id": 82,
      "material_id": 12,
      "delivered_on": "2025-09-27",
      "quantity": 53,
      "unit_price": 280,
      "line_cost": 14840
    },
    {
      "id": 122,
      "task_id": 41,
      "material_id": 7,
      "delivered_on": "2025-06-26",
      "quantity": 6,
      "unit_price": 21.5,
      "line_cost": 129
    },
    {
      "id": 123,
      "task_id": 26,
      "material_id": 2,
      "delivered_on": "2025-04-20",
      "quantity": 2,
      "unit_price": 780,
      "line_cost": 1560
    },
    {
      "id": 124,
      "task_id": 87,
      "material_id": 1,
      "delivered_on": "2025-11-01",
      "quantity": 15,
      "unit_price": 118,
      "line_cost": 1770
    },
    {
      "id": 125,
      "task_id": 83,
      "material_id": 1,
      "delivered_on": "2025-09-23",
      "quantity": 2,
      "unit_price": 118,
      "line_cost": 236
    },
    {
      "id": 126,
      "task_id": 44,
      "material_id": 5,
      "delivered_on": "2025-05-11",
      "quantity": 2,
      "unit_price": 215,
      "line_cost": 430
    },
    {
      "id": 127,
      "task_id": 98,
      "material_id": 1,
      "delivered_on": "2025-12-08",
      "quantity": 6,
      "unit_price": 118,
      "line_cost": 708
    },
    {
      "id": 128,
      "task_id": 3,
      "material_id": 3,
      "delivered_on": "2025-05-07",
      "quantity": 1,
      "unit_price": 1250,
      "line_cost": 1250
    },
    {
      "id": 129,
      "task_id": 109,
      "material_id": 2,
      "delivered_on": "2025-11-10",
      "quantity": 23,
      "unit_price": 780,
      "line_cost": 17940
    },
    {
      "id": 130,
      "task_id": 61,
      "material_id": 1,
      "delivered_on": "2025-07-24",
      "quantity": 11,
      "unit_price": 118,
      "line_cost": 1298
    },
    {
      "id": 131,
      "task_id": 111,
      "material_id": 1,
      "delivered_on": "2025-12-06",
      "quantity": 32,
      "unit_price": 118,
      "line_cost": 3776
    },
    {
      "id": 132,
      "task_id": 3,
      "material_id": 8,
      "delivered_on": "2025-05-16",
      "quantity": 14,
      "unit_price": 34,
      "line_cost": 476
    },
    {
      "id": 133,
      "task_id": 119,
      "material_id": 1,
      "delivered_on": "2026-01-19",
      "quantity": 13,
      "unit_price": 118,
      "line_cost": 1534
    },
    {
      "id": 134,
      "task_id": 18,
      "material_id": 14,
      "delivered_on": "2025-07-31",
      "quantity": 1,
      "unit_price": 54,
      "line_cost": 54
    },
    {
      "id": 135,
      "task_id": 74,
      "material_id": 4,
      "delivered_on": "2025-09-18",
      "quantity": 13,
      "unit_price": 640,
      "line_cost": 8320
    },
    {
      "id": 136,
      "task_id": 105,
      "material_id": 5,
      "delivered_on": "2026-01-10",
      "quantity": 57,
      "unit_price": 215,
      "line_cost": 12255
    },
    {
      "id": 137,
      "task_id": 101,
      "material_id": 2,
      "delivered_on": "2025-09-22",
      "quantity": 12,
      "unit_price": 780,
      "line_cost": 9360
    },
    {
      "id": 138,
      "task_id": 109,
      "material_id": 1,
      "delivered_on": "2025-10-20",
      "quantity": 26,
      "unit_price": 118,
      "line_cost": 3068
    },
    {
      "id": 139,
      "task_id": 117,
      "material_id": 12,
      "delivered_on": "2026-02-05",
      "quantity": 43,
      "unit_price": 280,
      "line_cost": 12040
    },
    {
      "id": 140,
      "task_id": 8,
      "material_id": 1,
      "delivered_on": "2025-03-09",
      "quantity": 39,
      "unit_price": 118,
      "line_cost": 4602
    },
    {
      "id": 141,
      "task_id": 42,
      "material_id": 4,
      "delivered_on": "2025-05-13",
      "quantity": 41,
      "unit_price": 640,
      "line_cost": 26240
    },
    {
      "id": 142,
      "task_id": 24,
      "material_id": 14,
      "delivered_on": "2025-08-12",
      "quantity": 13,
      "unit_price": 54,
      "line_cost": 702
    },
    {
      "id": 143,
      "task_id": 82,
      "material_id": 6,
      "delivered_on": "2025-09-24",
      "quantity": 3,
      "unit_price": 9.4,
      "line_cost": 28.2
    },
    {
      "id": 144,
      "task_id": 105,
      "material_id": 5,
      "delivered_on": "2026-01-21",
      "quantity": 14,
      "unit_price": 215,
      "line_cost": 3010
    },
    {
      "id": 145,
      "task_id": 46,
      "material_id": 8,
      "delivered_on": "2025-10-19",
      "quantity": 22,
      "unit_price": 34,
      "line_cost": 748
    },
    {
      "id": 146,
      "task_id": 104,
      "material_id": 4,
      "delivered_on": "2025-10-11",
      "quantity": 1,
      "unit_price": 640,
      "line_cost": 640
    },
    {
      "id": 147,
      "task_id": 94,
      "material_id": 6,
      "delivered_on": "2025-11-06",
      "quantity": 16,
      "unit_price": 9.4,
      "line_cost": 150.4
    },
    {
      "id": 148,
      "task_id": 92,
      "material_id": 1,
      "delivered_on": "2025-11-08",
      "quantity": 17,
      "unit_price": 118,
      "line_cost": 2006
    },
    {
      "id": 149,
      "task_id": 84,
      "material_id": 14,
      "delivered_on": "2025-08-27",
      "quantity": 4,
      "unit_price": 54,
      "line_cost": 216
    },
    {
      "id": 150,
      "task_id": 1,
      "material_id": 5,
      "delivered_on": "2025-06-15",
      "quantity": 1,
      "unit_price": 215,
      "line_cost": 215
    },
    {
      "id": 151,
      "task_id": 110,
      "material_id": 1,
      "delivered_on": "2025-12-09",
      "quantity": 8,
      "unit_price": 118,
      "line_cost": 944
    },
    {
      "id": 152,
      "task_id": 100,
      "material_id": 2,
      "delivered_on": "2025-12-16",
      "quantity": 17,
      "unit_price": 780,
      "line_cost": 13260
    },
    {
      "id": 153,
      "task_id": 65,
      "material_id": 2,
      "delivered_on": "2025-08-08",
      "quantity": 2,
      "unit_price": 780,
      "line_cost": 1560
    },
    {
      "id": 154,
      "task_id": 79,
      "material_id": 1,
      "delivered_on": "2025-09-11",
      "quantity": 25,
      "unit_price": 118,
      "line_cost": 2950
    },
    {
      "id": 155,
      "task_id": 40,
      "material_id": 3,
      "delivered_on": "2025-05-27",
      "quantity": 25,
      "unit_price": 1250,
      "line_cost": 31250
    },
    {
      "id": 156,
      "task_id": 62,
      "material_id": 2,
      "delivered_on": "2025-07-26",
      "quantity": 3,
      "unit_price": 780,
      "line_cost": 2340
    },
    {
      "id": 157,
      "task_id": 5,
      "material_id": 3,
      "delivered_on": "2025-02-15",
      "quantity": 50,
      "unit_price": 1250,
      "line_cost": 62500
    },
    {
      "id": 158,
      "task_id": 83,
      "material_id": 1,
      "delivered_on": "2025-09-17",
      "quantity": 4,
      "unit_price": 118,
      "line_cost": 472
    },
    {
      "id": 159,
      "task_id": 85,
      "material_id": 10,
      "delivered_on": "2025-09-30",
      "quantity": 44,
      "unit_price": 165,
      "line_cost": 7260
    },
    {
      "id": 160,
      "task_id": 7,
      "material_id": 1,
      "delivered_on": "2025-07-13",
      "quantity": 3,
      "unit_price": 118,
      "line_cost": 354
    },
    {
      "id": 161,
      "task_id": 64,
      "material_id": 3,
      "delivered_on": "2025-07-31",
      "quantity": 1,
      "unit_price": 1250,
      "line_cost": 1250
    },
    {
      "id": 162,
      "task_id": 41,
      "material_id": 1,
      "delivered_on": "2025-06-02",
      "quantity": 30,
      "unit_price": 118,
      "line_cost": 3540
    },
    {
      "id": 163,
      "task_id": 84,
      "material_id": 6,
      "delivered_on": "2025-09-03",
      "quantity": 55,
      "unit_price": 9.4,
      "line_cost": 517
    },
    {
      "id": 164,
      "task_id": 67,
      "material_id": 1,
      "delivered_on": "2025-08-04",
      "quantity": 2,
      "unit_price": 118,
      "line_cost": 236
    },
    {
      "id": 165,
      "task_id": 6,
      "material_id": 1,
      "delivered_on": "2025-02-21",
      "quantity": 20,
      "unit_price": 118,
      "line_cost": 2360
    },
    {
      "id": 166,
      "task_id": 9,
      "material_id": 1,
      "delivered_on": "2025-03-30",
      "quantity": 25,
      "unit_price": 118,
      "line_cost": 2950
    },
    {
      "id": 167,
      "task_id": 73,
      "material_id": 5,
      "delivered_on": "2025-10-18",
      "quantity": 8,
      "unit_price": 215,
      "line_cost": 1720
    },
    {
      "id": 168,
      "task_id": 26,
      "material_id": 6,
      "delivered_on": "2025-04-19",
      "quantity": 13,
      "unit_price": 9.4,
      "line_cost": 122.2
    },
    {
      "id": 169,
      "task_id": 34,
      "material_id": 4,
      "delivered_on": "2025-06-07",
      "quantity": 23,
      "unit_price": 640,
      "line_cost": 14720
    }
  ]
}